All-weather crossings shall be required. Where a street crosses the Leon Creek and
its tributaries, the San Antonio River, Salado Creek, San Pedro Creek, Martinez, Creek,
Apache Creek, Olmos Creek, or Alazan Creek, such all-weather crossing designs shall
be based on a one-hundred (100) year frequency as approved by the director of public
works. All other crossings shall be based on a twenty-five (25) year frequency storm.
All crossings, culverts and bridges shall be designed for an H-20-44 or H-20 S16-44
loading.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');