§ 28-134. Streetlights.  


Latest version.
  • (a)

    Streetlights shall comply with the City's dark skies ordinance and shall be provided in all subdivisions within the City. Streetlights shall be installed by CPS Energy at all public street intersections with other public streets, at the end of culs-de-sac longer than 200 feet, crosswalks, at safety lane intersections with public streets, midblock areas placed such that streetlights are a minimum of 300 feet apart for residential streets with houses fronting, or service areas as determined by CPS Energy, and at other locations as designated by the director of public works for adequate street lighting of the subdivision.

    (b)

    In subdivisions which do not exceed two dwelling units per acre, the director of public works may lessen the number and/or locations of street lights where he finds that the area does not require such lighting for safe pedestrian or vehicular traffic.

    (c)

    The subdivider shall contract with the City through the department of public works for payment of all costs associated with the engineering and installation of streetlighting. Such contracts must be executed prior to issuance of a letter of certification by the department of public works. Full payment for all costs must be made prior to the recordation of the plan. A copy of the current schedule of costs to the City of labor and materials associated with the engineering and installation of street lighting shall be filed by the Director of Public Works with the City Secretary and be available for public inspection. New schedules shall be filed whenever there is an increase in costs.

(Ord. No. 100-06-12, § I, 8-27-2012; Ord. No. 300-07-12, § I(2), 9-24-2012)